Successful use of Kuritherm®

A Turkish geothermal power plant solved valve blockages thanks to Kuritherm® products. A remarkable well maintenance time reduction could be achieved. It was calculated a saving of 6 million euro per year thanks to the operational improvements and reductions of shut downs. Read the full case study 141 here.

Indietro